“Do not repeat until previous iteration is complete” option causes wrong action scheduling

macOS Version 1.11.15 (1.11.15)

Android 1.10.0


Repeating action with these options has correct scheduling if “Do not repeat until previous iteration is complete” is disabled — next future action is scheduled at Jan 1 2027, with Sep 1 2026 action being put into Focus:

But enabling “Do not repeat until previous iteration is complete” option causes next future action to be scheduled on Mar 1 2027 instead (Sep 1 2026 action is still being put into Focus as expected)