macOS Version 1.11.15 (1.11.15)
Android 1.10.0
Repeating action with these options has correct scheduling if “Do not repeat until previous iteration is complete” is disabled — next future action is scheduled at Jan 1 2027, with Sep 1 2026 action being put into Focus:
But enabling “Do not repeat until previous iteration is complete” option causes next future action to be scheduled on Mar 1 2027 instead (Sep 1 2026 action is still being put into Focus as expected)