Sequential vs. Parallel Projects

When creating a project in Everdo, the project defaults to the Parallel attribute. The majority of my projects are sequential in nature. When I did my initial bulk data entry converting from my previous system, I neglected to give Sequential vs. Parallel any consideration, so they were intially set to Parallel. I’m requesting an option for the default behavior to be user configurable, perhaps somewhere under Settings. Also, when clicking on Projects on the left hand side, it would be handy to display on the project line on the right-hand side (perhaps next to the tags/area) whether the project is Parallel or Sequential without having to drill down on each and every one to inspect whether the value is set as desired.

In iOS app there is such option. I am not sure if there is one in Desktop apps.

1 Like

Indeed this setting exists in the iOS app and will soon be added to other platforms.